All About First and Second Fix Plumbing

Table of Contents

First and Second Fix Plumbing

First fix plumbing is the installation of pipework and other components required for water supply and distribution within a building. It typically takes place during the construction or renovation of a building, before the internal walls and finishes are completed. Here are the critical steps involved in first fix plumbing:

Planning the Plumbing Layout:

The most important step in plumbing installation is identifying the most appropriate layout. It is essential to plan the layout of the pipework and other components before starting any plumbing activity. This involves working from architectural plans or drawings to determine the best placement of pipes and fixtures. The following steps are usually included in planning the plumbing layout.

  • Measure the Space: The plumber will measure the space where the plumbing will be installed, including the height, width, and length of the walls, floors, and ceiling. This will help determine the size of the pipes needed and the best locations for fixtures.
  • Considering the Existing Plumbing: If you are adding new plumbing to an existing building, your plumber must consider the existing plumbing system. He will look for any existing pipes or fixtures that can be connected and consider how the new plumbing will integrate with the existing system.
  • Planning the Pipe Routes: Once the plumber has determined the fixtures’ location and the pipes’ length required, it’s time to plan the pipe routes. The plumber should consider each pipe’s most efficient and direct route while considering any obstacles, such as walls, floors, or other fixtures.
  • Choosing the Suitable Pipe Material: There are many different types of pipe materials to choose from, including copper, PVC, PEX, and more. A professional plumber will consider the pros and cons of each material, as well as the cost and ease of installation.
  • Ensure Proper Drainage: The plumber will ensure that each fixture has adequate drainage and that all pipes slope downward to ensure proper water flow. He will plan for any venting that may be necessary to prevent water from backing up into the system.
  • Considering Future Maintenance: Finally, when planning the plumbing layout, a professional plumber must consider future maintenance. He will ensure that each fixture is easily accessible for repairs and that valves or shut-off switches are easy to reach.

Get A Quotation

Feel Free To Contact Us For Free Consultation.

All About First and Second Fix Plumbing
  • Installing Pipes:

Layout planning is followed by installing the pipes that will supply and distribute water throughout the building. This includes running pipes from the main water supply to the point of use and installing drainage and waste pipes to remove wastewater from the building.

  • Installing Drainage Systems Along with the Water Supply Pipes:

Drainage systems are also included in the first fix plumbing stage. This includes installing the main soil stack, as well as the waste pipes and ventilation systems that are required for proper drainage. Drainage systems are critical to prevent water damage and ensure proper sanitation in the building.

Installing Heating Systems

The first fix plumbing includes installing heating systems, typically connected to the water supply and drainage system. This includes installing pipework for radiators, underfloor heating systems, and other heating equipment. If its a new build, the heating engineer should first perform the following steps:

  1. Determine the Heating Needs: The first step in installing a heating system is to determine the heating needs of the building. This involves calculating the heat loss of the building and determining the size and type of heating system required.
  2. Choose the Heating System: There are various types of heating systems, such as boilers, furnaces, heat pumps, and radiant heating systems. A professional heating engineer should choose a heating system that is appropriate for the size of the building and the heating needs of the occupants.
  3. Planning the Layout: The next step your plumber will perform is designing the layout of the heating system, including the location of the heating equipment, the location of the vents or radiators, and the path of the ductwork or piping.
  4. Installing the Heating Equipment: Once the layout has been planned, your plumber will install the heating equipment, which may include a furnace, boiler, or heat pump.
  5. Installing the Ductwork or Piping: Your plumber will install the ductwork or piping that will distribute the heated air or water throughout the building. He will ensure the ductwork or piping is adequately insulated and sealed to prevent heat loss.
  6. Installing the Vents or Radiators: He will next install the vents or radiators in each room, according to the planned layout. He will also ensure they are correctly sized and placed for efficient heating.
  7. Connecting the Thermostat: Your professional plumber will then connect the thermostat to the heating system, which will control the temperature of the building. He will ensure the thermostat is properly installed and calibrated.
  8. Testing the System: Once the heating system is installed, it will be tested to ensure it is functioning correctly. The temperature in each room will be checked, and any necessary adjustments will be made.
  9. Installing Bathroom and Kitchen Fixtures: Another critical aspect of the first fix plumbing is the installation of fixtures in bathrooms and kitchens. This includes installing pipework for showers, bathtubs, sinks, and toilets and connecting them to the main water supply and drainage systems.
  10. Testing: Before the first fix plumbing is complete, it is essential to test the system to ensure that it is functioning correctly. Pressure testing may be carried out to check each fixture’s leakages, water flow, and temperature.
  11. Completion: First Fix plumbing can be considered complete once all the above steps have been completed. The walls and finishes are completed, and plumbers can move to second fix plumbing.

Get A Quotation

Feel Free To Contact Us For Free Consultation.

What is Second Fix Plumbing?

The second fix plumbing is installing fixtures and fittings required to connect the water supply and drainage system to the final appliances and equipment in a building. This work typically takes place after the completion of the first fix plumbing and the installation of internal walls and finishes. Here are the key steps involved in second fix plumbing:

  1. Installing Taps and Valves: One of the most critical tasks of second fix plumbing is to install the taps and valves that control the water supply in the building. This includes fitting bath taps, sink taps, shower valves, and other similar fixtures. It’s essential to ensure that all the faucets and valves are fitted correctly and appropriately sealed to prevent leaks.
  2. Installing Toilets: Second fix plumbing also involves the installation of toilets and cisterns. This includes connecting the cistern to the main water supply and installing the toilet bowl. Ensuring the bathroom is appropriately sealed to prevent leaks and that the cistern is fitted at the right height is essential.
  3. Installing Radiators Radiators are a vital component of any heating system, and second fix plumbing involves the installation of radiators in each room of the building. This includes connecting the radiators to the pipework installed during the first fix plumbing stage and ensuring they are properly bled to remove any trapped air.
  4. Installing Showers and Baths: Second fix plumbing also involves installing showers and baths. This includes connecting the shower or bath to the water supply and drainage systems and ensuring that all the seals and connections are properly sealed to prevent leaks.
  5. Final testing The final step in the second fix plumbing is to test the entire system to ensure everything works correctly. This involves checking for leaks and ensuring that all the fixtures are working correctly. It’s essential to test the water pressure and temperature to ensure that they meet the requirements of the building.
  6. Final Checks and Commissioning Once the system has been tested and any necessary adjustments have been made, the second fix plumbing can be considered complete. At this point, final checks and commissioning of the system may be carried out to ensure it is ready for use.